Download Print this page

ParaBody 400102 Assembly Instructions Manual page 25

Parabody home gym assembly instructions

Advertisement

STEP 36
• Securely assemble the ball end of the AB CABLE (91) and one 3-1/2" PULLEY (79) to the FRONT UPRIGHT (11) using two 3/8
X 2-3/4" BOLTS (38), two 3/8" FLANGE SPACERS (66), two 3/8" WASHERS (51), and two 3/8" LOCKNUTS (48). (NOTE:
The AB CABLE (91) should be routed underneath the retaing bolt as shown in DETAIL 36.)
FIGURE 37
91
79
22
3/8 X 1-3/4" 36
1/2
0
FIGURE 36
SEE DETAIL 36
48
1/2
1/2
1
2
48
79
STEP 37
• Route threaded end of AB CABLE (91) around 3-1/2"
PULLEY (79) while assembling one 3-1/2" PULLEY
(79) to the lower FLOATING PULLEY BRACKET (22)
using one 3/8 X 1-3/4" BOLT (36) and one 3/8" LOCK-
NUT (48) as shown in FIGURE 37.
1/2
1/2
3
4
25
11
91
51
66
3/8 X 2-3/4" 38
DETAIL 36
1/2
5
6

Advertisement

loading

This manual is also suitable for:

Serious steel 400102