Making Transmission Tests - T&D RTR-500MBS-A Getting Started Manual

Mobile base station
Hide thumbs Also See for RTR-500MBS-A:
Table of Contents

Advertisement

Remote Unit
Assign a unique name for the Remote Unit.
Name
Recording Interval
Select the desired interval.
Enable Download
ON
Below are some examples of recording interval and maximum recording
time.
RTR-501 / 502 / 505 (Logging Capacity: 16,000 readings)
EX: Recording Interval of 30 seconds x data readings of 16,000 = 480,000
seconds (about 5 days and 13 hours)
RTR-503 / 507 / 574 / 576 (Logging Capacity: 8,000 readings)
EX: Recording Interval of 30 seconds x data readings of 8,000 = 240,000
seconds (about 2 days and 18 hours)
1 sec.
RTR-501 / 502 / 505
4 hr and 26 min
RTR-503 / 507 / 574 / 576
2 hr 13 min
• Upon reaching the logging capacity, the oldest data in the Remote Unit will be
overwritten and recording will continue.
5.
After having completed all entries, click [Register] at the bottom of
the window to register with the Base Unit.
6.
The registered Remote Unit starts recording automatically upon
completion of the registration. If you wish to register other Remote
Units, repeat the same procedures from .
• It is also possible to assign a date and time for a Remote Unit programmed
recording start. For details, see the Operation Guide [
[Starting Recording Manually].
Recording Interval
30 sec.
15 min.
60 min.
5 days 13 hr
166 days 16 hr
1 yr 10 mos
2 days 18 hr
83 days 8 hr
11 mos
Other Useful Functions] >
• Remote Unit Settings can also be changed or added later. For details, see the
Operation Guide [
Other Useful Functions] > [Changing Remote Unit Registration
Info].
4

Making Transmission Tests

1.
Open the [Transmission Tests] menu.
2.
Click the button of the desired test to open the corresponding test
setup window.
Check the contents of the display, make any necessary changes,
and click [Send].
3.
Check to make sure that the test was successful.
20

Advertisement

Table of Contents
loading

Table of Contents