Fast Cycle Valve Thru Regeneration; Final Set-Up - Pentair 5600SE Service Manual

Table of Contents

Advertisement

MODEL 5600SE Downflow
Control Start-up Procudures (Cont'd.)
6.

Fast Cycle Valve Thru Regeneration

A. Once the valve reaches Regen Step #1 let water run to drain for about 5 minutes.
Next, manually step the valve through a regeneration cycle checking valve operation in each step:
B. Push the Extra Cycle Button once to advance the valve to Regen Step #2.
C. Push the Extra Cycle Button once to advance the valve to Regen Step #3. (Optional)
D. Push the Extra Cycle Button once to advance the valve to Regen Step #4. (Optional)
E. Push the Extra Cycle Button once more to advance the valve back to Service.
7.

Final Set-Up

With proper valve operation verified:
A. Add water to the top of the air check. Manually step the valve to the Brine Draw Position and allow the
valve to draw water from the brine tank until it stops. Note: The air check will check at approximately the
midpoint of the screened intake area.
B. Next, manually step the valve to the Brine Refill Position and allow the valve to return to Service
automatically.
C. With the valve in Service, check that there is about 1.0" of water above the grid in the brine tank, if used.
D. Fill the brine tank with salt.
E. Set-Up is now finished, the control can now be left to run automatically.
Printed in U.S.A.
Page 7

Advertisement

Table of Contents
loading

Table of Contents