Pressure Relief Procedure; Shutdown - Graco Reactor E-10hp Instructions Manual

Hide thumbs Also See for Reactor E-10hp:
Table of Contents

Advertisement

Pressure Relief Procedure

Pressure Relief
Procedure
Follow the Pressure Relief Procedure whenever
you see this symbol.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury
from pressurized fluid, such as skin injection,
splashing fluid and moving parts, follow the Pressure
Relief Procedure when you stop spraying and before
cleaning, checking, or servicing the equipment.
1. Engage piston safety lock or trigger safety lock.
Fusion
2. Set function knob to Stop/Park
2
3
1
0
+
-
3. Turn Recirc/Spray valves to Recirc. Fluid will be
dumped to supply tanks. Pumps will move to the
bottom of their stroke. Ensure gauges drop to 0.
24
Probler
.
4
5
6
7
8
9
10
ti21490a
ti21495a

Shutdown

NOTE: For longer breaks (more than 10 minutes) use
the following procedure. If you will be shutdown for more
than 3 days, first see Flushing, page 26.
1. Shut off Heater Power.
2. Shut off Motor Power.
3. Follow all steps of Pressure Relief Procedure,
page 24.
4. Close gun fluid valves ISO and RES. Doing this will
keep the internal parts of the gun cleaner and pre-
vent crossover.
Fusion
5. Refer to your separate gun manual and perform
Shutdown procedure.
Probler
332144E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents