V. Unpacking the machine
1. Open the shipping box and take out the IU ship-
ping box and packaging material.
Note:
• Save the slope and cushion removed here for
later use.
• When storing or moving the IU, be sure to face
the TOP side up.
Cushion
2. Remove the fixing material (upper).
Slope
IU
A0P0IXC014DA
A0P0IXC015DA
A0P0IXC016DB
E-3
3. Hold onto the handle of the machine and tilt the
machine to the right and left. Under this condition,
remove the mirror mat and fixing material (lower).
4. Separate the cushion into two and install them to
the pallet (at two places).
5. Take out the slope and protective tape and
remove nails from the plastic bag.
A0P0IXC017DB
A0P0IXC018DB
A0P0IXC019DA
A0P0IXC067DA