Install Exhaust Guard
(European Compliance)
1. Position exhaust guard around muffler while aligning
mounting holes with holes in frame.
2. Secure exhaust guard to frame with (4) self tapping
screws.
Figure 10
1. Exhaust guard
Install ROPS
Important
Never weld or modify ROPS. Replace a
damaged ROPS, do not repair or revise. Any alteration of
ROPS must be approved by manufacturer.
1. Lower ROPS frame onto traction unit mounting
brackets, aligning mounting holes. Vent tube, secured to
ROPS, must be positioned on left side of machine.
2. Secure each side of roll bar to mounting brackets with
(2) flange head capscrews and locknuts (Fig. 11).
Torque fasteners to 60 ft–lbs.
3. Secure fuel line vent hose to vent tube on ROPS with
hose clamp.
Caution
Fuel line vent hose must be connected to vent tube
prior to starting engine or fuel will flow from hose.
2
1. ROPS
2. Mounting bracket
3. Vent tube
Install Front Lift Arms
1
1. Remove (2) capscrews securing lift arm pivot shaft link
to lift arm pivot shafts. Remove and retain pivot shaft
link and capscrews (Fig. 12).
1. Lift arm pivot shaft link
2. Insert a pivot rod into each (R.H. & L.H.) lift arm and
align mounting holes (Fig. 13).
16
3
5
4
Figure 11
4. Fuel line vent tube hose
5. Hose clamp
2
1
Figure 12
2. Lift arm pivot shaft
1
2