Water Circuit Filling; Grinding Adjustment - Saeco ROYAL OFFICE SUP 015V Operation And Maintenance

Hide thumbs Also See for ROYAL OFFICE SUP 015V:
Table of Contents

Advertisement

Available languages

Available languages

English
After fixing the plate the cover must be placed on the water
and bean hoppers before using the machine (Fig. 11).
Fig. 11
Secure the cover by turning the key in the lock (Fig. 12).
Fig. 12

Water circuit filling

Place a cup or other similar container under the hot water
spout. Start the machine and follow the procedure below
to fill the water circuit:
-
Wait for the display to read:
Now press the HOT WATER key, the pump starts automati-
cally and after a few seconds the display reads:
indicating that the circuit is ready and the machine can
start dispensing beverages.
"VENTILATE
"
"SELECT PRODUCT
"
"READY FOR USE
"
Important
Prime the circuit before starting the machine for the first
time, following a long period of inactivity, if the water tank
has been fully emptied or if the pump has malfunctioned.

Grinding adjustment

The grind setting should be adjusted when the coffee is not
dispensed properly: If the coffee drips out slowly then your
grind is too fine. If the coffee is dispensed too quickly then your
grind is too coarse. The suggested initial position is at point 5.
If grinding is too coarse and the coffee is dispensed too
rapidly, adjust the grinder to a finer setting (e.g., from 5 to
3). If the coffee drops out, select a coarser setting (e.g.,
from 5 to 7) (Fig. 13).
Fig. 13
Important
Grinding adjustments must be performed only when the
grinder is on. If possible avoid selecting position 1. Use
instead a different coffee blend, since not all blends pro-
duce the same results.

Hide quick links:

Advertisement

Chapters

Table of Contents

Troubleshooting

loading

Table of Contents