Wolf CFK-1 Installation, Operating And Maintenance Instructions page 26

Table of Contents

Advertisement

Collector installation
Bottom mounting rail
Flashing tape
M8
washer nut
Note:
26
Roof integration - Slate roof
8 x 80
Top mounting rail
M8 x 20
1. Insert the collector with the grub screws first into the lower mounting rail
according to the diagram and initially secure it with the M8 nut with washer
by hand.
2. Insert additional collectors likewise into the lower mounting rail.
3. Slide top mounting rail onto the upper edge of the collectors.
Secure the mounting rail to the collectors with the M8 x 20 combination
screws and washers, fasten hand-tight only for now.
4. Do not yet secure the upper mounting rail to the roof.
5. Secure the flow and return fittings. Check gaskets.
6. Check for leaks in accordance with the section "Leak testing".
Install the solar lines before fitting the edging panels around the
collector array. This will allow you to check the system for leaks.
Top mounting rail
CAUTION
- Are all gaskets in place?
- Maintain the necessary distance
- Align all threaded fittings
- Counter hold with a second
open-ended spanner
max. torque 20 Nm
15-60°
3062815_201508

Advertisement

Table of Contents
loading

Table of Contents