Wolf CFK-1 Installation, Operating And Maintenance Instructions page 21

Table of Contents

Advertisement

Collector installation
M8 x 20 combination screw
Bottom mounting rail
Flashing tape
M8
washer nut
Wooden spacer
(batten height
less 9 mm)
Note:
3062815_201508
Roof integration - Interlocking tile
Top mounting rail
8 x 80
1. Insert the collector with the grub screws first into the lower mounting rail
according to the diagram and initially secure it with the M8 nut with washer
by hand.
2. Insert additional collectors likewise into the lower mounting rail.
3. Position the wooden spacers (batten height) onto the rafters at the top of
the collectors. Position the mounting rail on top of the wooden spacers and
push against the top of the collector. Initially secure the mounting rail to the
collectors with the M8 x 20 combination screws and washers by hand.
4. Drill a Ø 5 mm hole through the mounting rail and the wooden spacers into
the rafter and secure to the rafter with 8 x 80 hexagon head cap wood screw.
5. Secure the flow and return fittings. Check gaskets.
6. Check for leaks in accordance with the section "Leak testing".
Install the solar lines before fitting the edging panels around the
collector array. This will allow you to check the system for leaks.
Top mounting rail
Wooden spacer
(batten height)
CAUTION
- Are all gaskets in place?
- Maintain the necessary distance
- Align all threaded fittings
- Counter hold with a second
open-ended spanner
max. torque 20 Nm
30-60°
21

Advertisement

Table of Contents
loading

Table of Contents