Selecting a Location

1-2
Power cords (one for each power supply)
Cable management bracket
10/100 Base-T crossover cable (for connecting to Ethernet
Console Port)
Out-of-Band serial console connection kit, including:
Male DCE-to-RJ-45 connector (connects to switch)
Female DTE-to-RJ-45 connector (connects to computer)
Male DTE-to-RJ-45 null modem connector (connects to a
modem)
Straight-through RJ-45 cable for connecting between
connectors
Product documentation
Options (as ordered)
Unpack the shipped items and report any lost or damaged items to
your shipping carrier or to your Avaya representative.
The location you select for installing the system hardware must
meet the following requirements:
19-inch EIA-standard grounded rack or table, with rails,
capable of supporting at least 80 kg (182 lb) in a cantilevered
application (rails should not deflect or distort). A fully-loaded
P550R/P580 switch weighs 60 kg (130 lbs). A fully loaded
P880/P882 switch weighs 80 kg (182 lbs).
At least 2 inches (5.2 cm) on either side of the system, and
from the rear of the system, to allow adequate airflow
through the system
Avaya P550R/P580/P880/P882 MultiService Switch Installation Guide, v5.3
(Figure
1-1).

Advertisement

Table of Contents
loading

This manual is also suitable for:

P580P880

Table of Contents