Installing the Switch

Avaya P550R/P580/P880/P882 MultiService Switch Installation Guide, v5.3
Figure 1-1. Selecting a Location
AC power source(s) within 2 m (6 ft.) (separate sources, on
separate circuits, if you require maximum fault tolerance)
Ambient temperature between 0°C and 40°C (32°F to 104°F)
Relative humidity less than 95%, non-condensing
The process for installing the switch is as follows:
1.
Preventing Electrostatic Discharge
2.
Installing the Chassis
3.
Installing the Cable Management Bracket
4.
Installing the Modules
5.
Installing the Cables
6.
Ensuring that You Have Enough Power Available
7.
Connecting the Power Supplies
8.
Powering On the System
* Note: The Avaya P550R switch requires 16MB RAM for proper
functioning.
Unpacking and Installing
Air Flow
1-3