Preparation For Service; Warnings; Sequence Of The Operations - Biasi RinNOVA 24S User Manual And Installation Instructions

Rinnova
Table of Contents

Advertisement

6

PREPARATION FOR SERvIcE

6.1 Warnings

Before performing the operations
described below, make sure that
the installed bipolar switch is in
the off position.

6.2 Sequence of the operations

Gas supply
• Open the cock for the gas meter and for the
boiler 5 in Figure 6.1.
5
Open position
Figure 6.1
• Check for leaks in the gas fitting using a
soapy solution or an equivalent product.
• Reclose the gas cock 5 in Figure 6.2.
PREPARATION FOR SERVICE
5
Figure 6.2
Filling the heating system
• Remove the front panel on the body, see sec-
tion "Removing the body panels" on page
59.
• Open the installed system cocks
• Open one or more hot water cocks to bleed
the pipes.
• Loosen the automatic bleed valve cap 27 in
Figure 6.3.
Figure 6.3
• Open the radiator cocks.
closed position
25
- 51 -
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rinnova 28sRinnova 32s

Table of Contents