Installing The Terminal Block - National Instruments SCXI-1321 Installation Manual

Offset-null and shunt-calibration high-voltage terminal block
Hide thumbs Also See for SCXI-1321:
Table of Contents

Advertisement

5
3
4
2
1
20
19
1 Screw Terminals
2 Product Information
3 W1 (CH0 Null Enabled)
4 W2 (CH1 Null Enabled)
5 R3 (CH0 Null Resistor)
6 R4 (CH0 Shunt Resistor)
7 R5 (CH1 Null Resistor)
Note: R3 through R10 are socketed.

Installing the Terminal Block

© National Instruments Corporation
6
7
8
8 R6 (CH1 Shunt Resistor)
9 R7 (CH2 Null Resistor)
10 R8 (CH2 Shunt Resistor)
11 R9 (CH3 Null Resistor)
12 R10 (CH3 Shunt Resistor)
13 W5 (CJC Mode)
14 Warning Label
Figure 2. SCXI-1321 Circuit Parts Locator Diagram
To connect the terminal block to the SCXI module front connector,
complete the following steps:
1.
Connect the module front connector to its connector on the terminal
block.
2.
Make sure that the module top and bottom thumbscrews do not
obstruct the rear panel of the terminal block.
3.
Tighten the top and bottom screws on the back of the terminal block to
hold it securely in place.
4.
Refer to the
Performed or Supported Signal Conditioning
information on specific signal conditioning.
9
10
11
12
15 W4 CH3 Null Enabled)
16 W3 (CH2 Null Enabled)
17 R15 (CH3 Null Potentiometer)
18 R14 (CH2 Null Potentiometer)
19 R2 (CH1 Null Potentiometer)
20 R1 (CH0 Null Potentiometer)
5
SCXI-1321 Terminal Block Installation Guide
13
14
15
16
18
17
section for

Advertisement

Table of Contents
loading

Table of Contents