Bgd36Cf Finishing; Log Placement; Glass/Door Replacement; Bgd42Cf Finishing - Napoleon BGD36CFNTR Installation And Operating Instructions Manual

Napoleon fireplaces gas fireplace installation and operating instructions
Table of Contents

Advertisement

30
FINISHING

BGD36CF FINISHING

LOG PLACEMENT

TM
PHAZER
logs and glowing embers exclusive to Napoleon® Fire-
places, provide a unique and realistic glowing effect that is different
in every installation. Take the time to carefully position the glowing
embers for a maximum glowing effect.
Log colours may vary. During the initial use of the fi replace, Log
colours may vary. During the initial use of the fi replace the colours
will become more uniform as colour pigments burn in during the heat
activated curing process.
SIDEVIEW
1. Place the back log (#1) onto the log support
tray and in front of the tabs. The tabs maintain
an air space between the log and fi rebox back
to facilitate combustion air fl ow. Ensure that the
back of the log rests against the brackets on the
back wall of the fi rebox.
FIGURE 94
TAB
2. Move the two small logs (#2 & #3) into position, lining up the
studs located on the burner with the holes on the bottom of the
logs. Ensure that the small logs sit fl at on the burner.
3. Place the bottom of the left crossover log (#4) against the left
fi rebox side and pulled forward to the grate.
The top of the log should rest in the pocket on the back log.
4. Position the base end of the center log (#5) against the middle
grate post with the other end of the log resting in the pocket of the
left crossover log.
W415-0661 / C / 02.20.08
5. Place the bottom of the right crossover log (#6) against the right
fi rebox side and pulled forward to the grate. The top of the log
should rest in the pocket provided on the center log (#5).
BGD36CF(G) GLASS/DOOR REPLACEMENT
1. Place the door frame face down care-
ful not to scratch the paint.
2. Center the gasketed glass
FIGURE 93
FIGURE 93
inside the door frame with the
thick side of the gasket fac-
ing up.
3. Bend the glass retainers lo-
cated along the edge of the door
frame over the gasket holding
the glass in place. Careful not to
break the glass.

BGD42CF FINISHING

DOOR INSTALLATION / REMOVAL

Open the Valve Access
Door. While holding the
door securely, release
the 4 latches along
FIGURE 95
FIGURE 95
the top of the door.
Tilt the door forward
and lift off of the
two brackets at the
bottom of the door.
When replacing the
door, rest the door on the
brackets ensuring that lip
of the brackets rest in the
groove in the bottom edge
FIGURE 96
FIGURE 96
of the door. Push the door
backward into place and
secure with the 4 latches.
REMOVING THE VALVE ACCESS DOOR
1. The valve access door rotates on the
pins attached to the side frame. Lift the
valve access door off the pins to operate
the main glass door.
FIGURE 97
FIGURE 97

GLASS/DOOR REPLACEMENT

Only available as an assembly complete with frame W010-0770.
Glass not available seperately.
FIGURE 98
FIGURE 98
FIGURE99
FIGURE 100
FIGURE 100
DOOR LATCH
DOOR BRACKET
FIGURE 101

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bgd36cfgnBgd42cfnBgd36cfgpBgd36cfptrBgd42cfp

Table of Contents