Preparations Before Installation - Daikin FHY35BJV1 Installation Manual

Hide thumbs Also See for FHY35BJV1:
Table of Contents

Advertisement

4. PREPARATIONS BEFORE INSTALLATION

(1) Relation of holes for indoor unit, suspension bolt position, piping and wiring.
F
Front view
Left side piping hole
Model
Type 35, 45, 50
Type 60, 71
Type 100
Type 125
(2) Make holes for suspension bolts, refrigerant and drain piping, and wiring.
• Refer to the paper pattern for installation.
• Select the location for each of holes and open the holes in the ceiling.
(3) Remove the parts from the indoor unit.
(3-1) Detach the suction grille.
• Slide the locking knobs (×2) on the suction grille inward (direction of arrows) and lift upwards.
(Refer to Fig. 1)
• With the suction grille open, remove the suction grille forward, holding on to the rear tabs on the suction
grille. (Refer to Fig. 2)
Fig. 1
(3-2) Remove the dressing boards (left and right).
• After removing the securing screws for the
dressing boards (one each), pull them forward
(in the direction of the arrow) and remove
them. (Refer to Fig. 3)
• Take out the accessories.
6
G
Rear side piping hole
A
B
960
920
1160
1120
1400
1360
1590
1550
A
B
C
D
E
False ceiling view
Air outlet
C
D
390
375
490
475
610
595
705
690
Fig. 2
Fig. 3
Dressing board securing
screw (M4)
Dressing board
Top side drain
piping hole
Top gas piping hole
Suspension
bolt (×4)
Top liquid piping hole
(Length : mm)
E
F
310
400
375
410
500
475
530
620
595
625
715
690
Accessories
G
English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents