Daikin FHY35BJV1 Installation Manual page 13

Hide thumbs Also See for FHY35BJV1:
Table of Contents

Advertisement

• Make absolutely sure to execute heat insulation works on the pipe-connecting section after checking gas
leakage by thoroughly studying the following figure and using the attached heat insulating materials for fit-
ting (6) and (7). (Fasten both ends with the clamps (4).)
(Refer to Fig. 13)
• Wrap the sealing pad (9) only around the insulation for the joints on the gas piping side.
(Refer to Fig. 13)
CAUTION
• Be sure to insulate any field piping all the way to the piping connection inside the unit. Any exposed piping
may cause condensation or burns if touched.
Fig. 13
Procedure for thermal insulation of gas-side piping
Insulating material for joints (6)
(accessory)
Orient so that the end of
the wrapped insulation
material is facing up
Piping insulation material
(Locally procured)
Procedure for thermal insulation of liquid-side piping
Orient so that the end of
the wrapped insulation
material is facing up
Piping insulation material
(Locally procured)
English
Flare nut connection
Insulation for gas pipe (6) (attached)
Insulation for liquid pipe (7) (attached)
Insulating material for
joints (7)(accessory)
Flare nut connection
Wind around the
pipe, beginning at
Piping insulation
the base.
material
(main unit)
Small seal material
(9) (accessory)
Attach to base
Main unit
Clamp (4)
(accessory)
Gas piping
Liquid piping
Clamp (4) (attached) (× 4)
Attach to the bottom
(For both gas piping and liquid piping)
Piping insulation material (main unit)
Attach to base
Main unit
Clamp (4) (accessory)
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents