CORRECT system for installing
S
A
Fig. 6.6
A = air intake
S = fl ue exhaust
INSTALLATION
S
INCORRECT system for installing
S
A
Fig. 6.7
A = air intake
S = fl ue exhaust
6.8
Choice of fl u
The fl ue exhaust/air intake can be installing
in the mode:
C
C
C
C
13
33
53
63
Refer to the sheet provided with the pre-
selected kit, in separate packaging.
The horizontal routes of the fl ue pipes must
incline about 1.5 degrees (25 mm per me-
ter).
The terminal must be higher
than the infeed boiler side.
The single coaxial pipe with terminal must
S
- 39 -