Installing The Bracket - Biasi Activ A 18S User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Activ A 18S:
Table of Contents

Advertisement

250
25
200
All measures are in mm
Fig. 6.1
When installing the boiler in a cupboard,
cover or alcove allow at least 5 mm per-
manent clearance from the front face of
the boiler. Also ensure suffi cient clearance
to allow free access for servicing and the
lowering of the front control panel.
If the boiler is installed outside, cover the
appliance to protect it against the elements
and add some special anti-freeze (neutral-
ised) to the c.h. system.
Before installing the boiler on an existing
c.h. system, fl ush it out thoroughly be fore-
fi tting the boiler, so as to remove muddy
deposits.
It is advisable to equip the system with a
sediment fi lter, or use a water-treatment
product in the circulating water.
The latter option in particular, not only
- 36 -
INSTALLATION
cleans out the system, but also has an anti-
corrosive effect by promoting formation of a
protective skin on metal surfaces and neu-
tralising gases present in the water.
We recommend the use of a suitable uni-
versal inhibitory to protect the c.h. system
25
from corrosion.
6.3
Precautions
Before mounting the bracket, check that the
dimensions for fi tting the exhaust fume duct
are complied with (refer to the leafl et includ-
ed with the fl ue kit, packed separately).
Utilise the paper template supplied with the
boiler to determine the fi xing position for
the bracket and boiler. Securely mount the
bracket to the wall using appropriate fi xings
suitable for the type of wall construction and
capable of supporting the total (wet) load.
Refer to the weight given in the technical
data tables specifi c for each model.

Installing the bracket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Activ a 30sActiv a 25s

Table of Contents