Installation; Warnings; Precautions For Installation - Biasi RIVA PLUS HE 24C ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for RIVA PLUS HE 24C ERP:
Table of Contents

Advertisement

6

INSTALLATION

6.1

Warnings

The use of gas appliances is
subject to statutory control; it is
essential to observe the current
regulations and laws in force
(see also chapter 5).
The appliance must discharge
combustion products directly
outside or into a suitable ex-
haust duct designed for this pur-
pose.
Combustion
must be discharged using origi-
nal flue kits only, since they are
integral parts of the boiler.
For LPG, the appliance must also conform
with the requirements of the distributors and
comply with current Regulations and laws in
force.
The safety relief valve and the condensate
drain must be connected to a suitable drain,
or discharge in a safe manner.
The electrical wiring must conform with cur-
rent Regulations, in particular:
• The boiler must be earthed using the cor-
rect bonding clamp.
• Adjacent to the boiler a fused spur isola-
tion switch must be installed which permits
a complete switching off in the conditions
of the overvoltage category III.
Refer to section "Electrical connections" to
page 48 in this chapter for the electrical con-
nections.
In no circumstances will the manufac-
turer be held responsible if the warnings
and instructions contained in this manu-
al have not been complied with.
INSTALLATION
6.2
• The boiler must be fixed to a strong wall.
• The dimensions for the exhaust fume duct
(detailed in section "Choice of flue" to
page 46) and the correct procedures for
installing the duct, depicted in the instruc-
tion leaflet included with the flue kit, must
products
be complied with during installation.
• To allow maintenance procedures it is
necessary to leave the minimum gaps in-
dicated in Fig. 6.1.
Fig. 6.1
• When installing the boiler in a cupboard,
cover or alcove allow at least 50 mm per-
manent clearance from the front face of
the boiler. Also ensure sufficient clearance
to allow free access for servicing and the
lowering of the front control panel.

Precautions for installation

The
following
must be respected for installa-
tion:
250
25
200
All measures are in mm
prescriptions
50
- 43 -