Download Print this page

Carrier A07049 Installation Instructions Manual page 20

Performance series ac/hp

Advertisement

Single-Piece Installation
The following steps should befollowed for
the installation
of the single-piece
configuration.
1. Remove
cover from Equipment
Control
Module
by pressing
the two tabs
on the bottom
edge and pulling
away. Route wires through
large hole in
Equipment
Control
Module.
Level
Equipment
Control
Module
against
wall (for aesthetic
value only - Equipment
Control
Module
need not be
leveled
for proper
operation)
and mark wall through
4 mounting
holes.
To avoid
unintended
bending
of wall plate plastic,
use all 4 screws
and
anchors.
2. Drill four 3/16-in.
mounting
holes
in wall where
marked.
Thermostat
may be mounted
to a standard
junction
box if desired.
Hole
pattern
on
Equipment
Control
Module
matches
junction
box mounting
holes.
3. Secure
rear plastic
Equipment
Control
Module
to wall with 4 screws
and
anchors
provided.
To avoid unintended
bending
of wall plate plastic,
use
all 4 screws
and anchors.
Make
sure all wires
extend
through
hole in
Equipment
Control
Module.
4. Adjust
length
and routing
of each wire
to reach
proper
connector
block
and terminal
on Equipment
Control
Module
with 1/4-in.
(6 mm) extra
length.
See Fig. 14.
19

Advertisement

loading

This manual is also suitable for:

A07048