Lighting - Stanley Tara Boiler Installation And Operating Instructions Manual

Solid fuel stove
Table of Contents

Advertisement

Before lighting the stove check with the installer that the installation work and
commissioning checks described in the installation instructions have been
carried out correctly and that the chimney has been swept clean, is sound
and free from any obstructions. As part of the stove's handover the installer
should have demonstrated how to operate correctly.
1.
Before lighting the stove, ensure that any build up of ashes in the fire
box has been removed and that the ashpan has been emptied.
2.
Open the firebox and cover the grate with crumpled pieces of paper.
3.
Lay pieces of kindling on top of the paper towards the back of the fire
box.
4.
Open the primary air inlet by turning the spin valve at the front of the
stove anticlockwise.
5.
Open the secondary air control by sliding the control knob located
over the top of the fire door to the left.
6.
Ignite the paper and close the firedoor.
7.
When the kindling is well alight, open the fire door and add more kin-
dling of a larger size to sustain the fire. Close the firedoor.
8.
Never use inflammable liquid i.e. gasoline, petrol paraffin etc. to
start or "freshen up" afire in this heater.
9.
When a hot bed of fuel is established, add the normal fuel and adjust
the spin valve to the required setting.
10.
To shut the fire down, do not add fuel, make sure that the firedoor is
properly closed and that the primary and secondary air controls are all
in the closed position. Cutting off the air supply will reduce the heat
output.
11.
Following a prolonged shutdown of the appliance perhaps after the
summer break, ensure the flueway is free from obstruction prior to
re-lighting.
Re-fuelling -Open the firedoor and reload, close the firedoor.

LIGHTING

13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tara non boilerTara dhw

Table of Contents