Upper Shaft Assembly Attachment - Brother PR600II Service Manual

Hide thumbs Also See for PR600II:
Table of Contents

Advertisement

Main unit
1

Upper shaft assembly attachment

1. Apply FBK OIL RO100 to the 2 felts 1.
2. Attach the felts to the lower shaft metal collars on the arm bed. (2
locations)
3. Hang the T-belt (S5M-525) currently on the lower shaft over the timing
pulley of the upper shaft final assembly 2. Align the upper shaft final
assembly's 2 upper shaft metals with the upper shaft metal collars on the
arm bed, and attach the upper shaft to the arm bed.
*Key point
• Be careful not to damage the encoder.
4. Secure the 2 metal pressers 3 with the 4 screws 1.
5. Apply MOLYKOTE EM-30L to the groove on the presser foot cam and
thread take-up cam.
6. Apply oiler to the upper shaft metal 4.
7. Align the notch on the encoder base with the pulley's base line, and attach
the pulley to the upper shaft assembly.
Start movie clip (CD-ROM version only)
Apply MOLYKOTE EM-30L to the groove on the
presser foot cam and thread take-up cam.
Apply oiler to the upper shaft metal.
1
Upper shaft unit
circumference
Taptite, Bind S
1.47 – 1.96 N-m
M4X10
4
Cam groove
1 to 2 drops
1
Torque
1
2
3
1
4
3 - 35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr620

Table of Contents