Download Print this page

Scope Of Delivery; Basic Device; Switch Box; Transport - Dimplex LAS 10MT Installation And Operating Instructions Manual

Air-to-water heat pumps for swimming pool heating (outdoor installation)

Advertisement

Available languages

Available languages

3
3

Scope of Delivery

3.1 Basic Device

The heat pump is of compact design and is supplied complete
with the components listed below.
The refrigerant circuit contains the Kyoto protocol approved re-
frigerant R407C with a GWP value of 1525. It is CFC-free, does
not deplete ozone and is non-flammable.
1)
Evaporator
2)

Switch box

3)
Ventilator
4)
Filter dryer
5)
Compressor
6)
Titanium heat exchanger
(Illustration: Front casing removed)
3.2 Switch Box
The switch box is located in the heat pump and can be accessed
by removing the covering panel assembly (the panel assembly
screw-holes are sealed by cover caps).
The switch box contains the supply connection terminals, as well
as the power contactors, the soft starter unit and the remote con-
trol connection terminals.
Heat pump control is via the remote control provided in the scope
of supply (see also Section 8).
E-4
4

Transport

ATTENTION!
When transporting the heat pump, ensure that it is not tilted more than
45° (in any direction).
Use the wooden pallet for transporting the heat pump to its final
installation location. Either a lifting truck or 3/4" pipes fed through
the holes in the base plate or frame can be used for transporting
the heat pump.
ATTENTION!
The heat pump and transport pallet are only joined by the packing film.
To avoid injuring your hands, ensure that the pipes cannot slip
when being used to lift the pump.
When inserting the pipes through the frame, ensure that the com-
ponents are not damaged (especially the plastic condensate tray
and/or the drain stubs).
5

Installation

5.1 General Information

The device should always be installed on a permanently smooth,
even and horizontal surface. To counteract development of any
solid-borne sound, the entire frame (and its supporting surface)
should be in contact with the floor. If this is not possible, addi-
tional constructional measures to improve sound insulation may
need to be provided by the customer. It must be possible to carry
out maintenance work without hindrance. This can be ensured by
maintaining a clearance of 1.2 m around the device.
ATTENTION!
Do not restrict or block the area around the air intake or outlet.

Advertisement

loading

This manual is also suitable for:

Las 15mtLas 22tt