Refer to the following illustration when installing a hot-swap power supply.
Note:
To install an additional power supply:
90
IBM® Netfinity® 7100 User's Reference
The illustrations in this book might differ slightly from your hardware.
Handle
DC power light
AC power light
1. Review "Before you begin" on page 66.
2. Remove the filler panel.
3. Place the handle on the power supply in the open position.
4. Slide the power supply into the chassis and close the handle.
5. Plug one end of the power cord into the power supply; then, plug the other end of
the cord into a properly grounded electrical outlet.
6. Verify that the DC power light and the AC power light on the power supply are
lit, indicating that the power supply is operating properly.
Statement 6
CAUTION:
If you install a strain-relief bracket option over the end of the power cord that is
connected to the device, you must connect the other end of the power cord to an
easily accessible power source.
Filler panel