Installation; Hearth Requirements - Jøtul GF 370 DV II Installation And Operation Instructions Manual

Direct vent gas stove
Table of Contents

Advertisement

Installation

Stove Location
In selecting a location for the stove, consider the
following points:
1) Heat distribution
2) Vent termination requirements
3) Gas supply routing
4) Traffic areas, furniture, draperies, etc.
5) 120V electrical outlet availability
This stove may be located on or near conventional
construction materials, however, proper clearance to
combustibles must be maintained in order to provide
adequate air circulation around the appliance. Also, it
is important to provide adequate access around the
stove for servicing and proper operation.
The clearances specified in this manual are the
minimum requirements established as a result of
safety testing. A combustible material is anything
that can burn; i.e. sheet rock , wall paper, wood,
fabrics, etc. These surfaces are not limited to those
that are visible and also include materials that may
be located behind non-combustible materials.
If you are not sure of the combustible nature
of a material, consult your local fire officials. "Fire-
resistant" materials are considered to be combustible.
They may be difficult to ignite, but will burn. "Fire
-rated" sheet rock is also considered combustible.

Hearth Requirements

The Jøtul GF 370 DV II has been approved for
installation directly on combustible floor materials,
including carpeting. No additional floor protection is
required, however, we recommend that the stove be
installed on a solid surface.
5”
Corner Installation
Figure 3. Corner Clearances.
13 3/4”
5”
Stove and Vent Clearance
Requirements
Clearance is measured from the stove body as
illustrated - not the Safety Barriers.
Minimum Clearances:
See figs. 3-5.
Rear:
3" (76 mm) - from Rear of the unit
Ceiling:
16 3/4" (425 mm) - from Stove Top
Corner:
5" (127 mm) - from Stove Top
Sides:
7" (178 mm) - from Stove Top
Minimum Clearances from the Vent Pipe
to Combustibles:
Horizontal Run:
Off the top of the pipe - 2" (51 mm) Alcove - 7" (178 mm)
Off the sides and bottom - 1" (25 mm)
Vertical Run: All sides
7”
Figure 4. Alcove and Wall Clearances.
ALCOVE SPECIFICATIONS:
Maximum Alcove Depth:
Minimum Alcove Width:
Minimum Ceiling Height:
3”
Figure 5. Parallel Wall Clearances.
139467_03 GF 370 DV II
June 2015
- 1" (25 mm)
15 5/8”
3”
12 3/4”
7”
21 3/4" (55.2 cm)
31 1/4" (79.3 cm)
62 1/4" (158.1 cm)
15 5/8”
12 3/4”
7”
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents