Jøtul GF 370 DV II Installation And Operation Instructions Manual page 17

Direct vent gas stove
Table of Contents

Advertisement

Flame Sensor
Figure 23. Fuel conversion components and assemblies
8. Reinstall the Burner Plate by engaging the
venturi tube with the Air Shutter. BE CERTAIN
THE BURNER IS LEVEL AND SECURELY SEATED ON
THE SUPPORT LEGS ON THE FIREBOX FLOOR.
9. Replace the variable regulator. Using a Torx T-20
screwdriver, remove the two specialty screws
from the regulator tower on the front of the
valve. Note: To help identify which screws to remove,
refer to the new regulator in the kit. See fig. 23.
10. Disconnect the Regulator wire lead from
the receptacle housing terminal. Remove the
regulator tower and the rubber diaphragm.
11. Install the new variable regulator tower from the
kit. Be sure that the gasket is properly positioned
and tighten screws securely. Connect the wire
lead.
Pilot Hood
Ignitor
Orifice Lever
Diaphragm
IFC Reset Button
Injector
Regulator
Regulator
Tower
12 . Apply the identification labels to the stove so that they can
be seen by any person that may be servicing the stove.
• Label "A": Apply to front lip of the valve compartment.
• Label "B": Apply to the Rating Plate.
• Small valve sticker: Apply to valve.
13. Install the accessory panels and burner media as
appropriate. See pages 19-21.
14. Apply anti-seize lubricant to the socket head glass
frame screws before reinstalling the glass frame.
15. Apply gas to the system and check for leaks using
a soapy water solution or gas sensor.
16. Follow the System Check instructions on pages 22-23
for initial start-up and flame picture adjustment.
139467_03 GF 370 DV II
Primary Air
Shutter
Use new Torx
screws supplied
June 2015
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents