Evacuating The System - Lennox XP17-024-230-01 Installation And Service Procedure

Table of Contents

Advertisement

Evacuating the System

Evacuating the system of non-condensables is critical for proper operation of the unit. Non-condensables are defined as any
gas that will not condense under temperatures and pressures present during operation of an air conditioning system.
Non-condensables and water suction combine with refrigerant to produce substances that corrode copper piping and
compressor parts.
Danger of Equipment Damage. Avoid deep vacuum operation. Do not use compressors to evacuate a system.
Extremely low vacuums can cause internal arcing and compressor failure. Damage caused by deep vacuum
operation will void warranty.
LINE SET AND INDOOR COIL
CONNECT GAUGE SET
NOTE — Remove cores from service valves (if not al­
ready done).
A
Connect low side of manifold gauge set
with 1/4 SAE in-line tee to vapor line
service valve
B
Connect high side of manifold gauge
set to liquid line service valve
C
Connect micron
connector on the 1/4 SAE in-line tee.
D
Connect the vacuum pump (with
vacuum gauge) to the center port of the
manifold gauge set. The center port
line will be used later for both the
HFC-410A and nitrogen containers.
NITROGEN
HFC-410A
EVACUATE LINE SET AND INDOOR COIL
The unit is shipped with a factory refrigerant charge. The
liquid and suction line valves were closed after final testing
at the factory. Do not operate these valves until the line set
and indoor coil have been evacuated and leak checked, or
the charge is lost.
Note: Do not use any portion of the factory charge for
purging or leak testing. The factory charge is for filling the
system only after a complete evacuation and leak check
has been performed.
Line set and indoor coil should be evacuated using the
recommend deep vacuum method of 500 microns. If deep
vacuum equipment is not available, the alternate triple
evacuation method may be used by following the specified
procedure.
XP17
gauge
available
OUTDOOR
UNIT
VACUUM PUMP
Figure 44. Connecting Gauge Set
WARNING
A34000 1/4 SAE TEE WITH
SWIVEL COUPLER
A
C
B
D
If vacuum must be interrupted during the evacuation
procedure, always break vacuum with dry nitrogen.
The deep vacuum method requires a vacuum pump
capable of pulling a vacuum to 500 microns and a vacuum
gauge capable of accurately measuring this vacuum level.
The deep vacuum method is the most positive way of
assuring a system is free of air and water.
Watch the vacuum gauge as the system is pulling down.
The response of the gauge is an indicator of the condition of
the system (refer to figure 45).
With no leaks in the system, allow the vacuum pump to run
for 30 minutes minimum at the deep vacuum level.
Page 74
LOW
500
MICRON
GAUGE
TO VAPOR
SERVICE VALVE
TO LIQUID LINE
SERVICE VALVE
RECOMMEND
MINIMUM 3/8" HOSE
Deep Vacuum Method
MANIFOLD
GAUGE SET
HIGH

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents