Furuno TZT9 Installation Manual page 9

Multi function display
Hide thumbs Also See for TZT9:
Table of Contents

Advertisement

5. Set the TZT9/14 to the cutout.
6. Fasten the flush mount fixtures to the holes for the hanger at both sides of TZT9/
14 with two hex. bolts (M8x15, supplied).
7. Fasten each wing bolt so that the protector for screw touches the mounting panel.
8. Fasten the wing nuts tightly.
TZT9/14 with a fixing panel, top view
Flush mount fixture
Holes for the hanger
Wing bolt
Wing nut
Flush mount fixture
Protector for screw
Mounting panel
1. MOUNTING
Hex. bolt (M8x15)
1-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tzt14

Table of Contents