Sign In
Upload
Manuals
Brands
Nordyne Manuals
Air Conditioner
R8HE Series
Nordyne R8HE Series Manuals
Manuals and User Guides for Nordyne R8HE Series. We have
2
Nordyne R8HE Series manuals available for free PDF download: Installation Instructions Manual
Nordyne R8HE Series Installation Instructions Manual (52 pages)
SINGLE PACKAGE GAS HEATING / ELECTRIC COOLING 3-PHASE & SINGLE PHASE (REVISION A)
Brand:
Nordyne
| Category:
Air Conditioner
| Size: 7.25 MB
Table of Contents
Table of Contents
2
Important Safety Information
3
Requirements & Codes
4
General Information
5
Before You Install this Unit
5
Locating the Equipment
5
Heating Load
5
Combustion Air & Venting Requirements
5
Vent Termination
6
Circulating Air Supply
7
Air Ducts
7
Unconditioned Spaces
7
Acoustical Duct Work
7
Unit Installation
7
Packaging Removal
7
Rigging & Hoisting
7
Clearances to Combustible Materials
8
Ground Level
8
Rooftop
8
Horizontal to Downflow Conversion
9
Condensate Drain (Air Conditioning)
9
Air Filter Requirements
9
Removal of Internal Filter Rack
9
Installing Filters in the Internal Filter Rack
9
Removing Filters from Internal Filter Rack
9
Electrical Wiring
11
Pre-Electrical Checklist
11
Grounding
11
Line Voltage
11
Unbalanced 3-Phase Supply Voltage
12
Thermostat / Low Voltage Connections
12
2-Stage Heat / 1-Stage Cool Thermostat
12
Single Stage Heat / Single Stage Cool Thermostat
12
Heat Anticipator
13
Cooling Configurations
13
Heating Configurations
13
Blower Speed
13
Configuring the Fixed Speed Blower
13
Selecting Cooling Airflow
13
Selecting Heating Airflow
13
Dehumidification Options
14
Optional Furnace Control Board Connections
14
Electronic Air Cleaner
14
Humidifier
14
Gas Supply & Piping
15
Leak Check
15
High Altitude Conversion - Natural Gas
16
LP / Propane Gas Conversion
16
Start up & Adjustments
18
Pre-Start Check List
18
Start-Up Procedure
18
Air Circulation
18
Lighting the Appliance
18
Verifying System Heating
19
Verifying & Adjusting Temperature Rise
19
Gas Supply Pressure Verification & Adjustment
19
Verifying the Firing Rate of the Appliance
19
Measuring the Manifold Pressure
20
Adjusting the Manifold Pressure
20
Removing the Manometer/Pressure Gauge
20
Verifying Over-Temperature Limit Control Operation
20
Verifying Burner Operation
21
Verifying System Cooling
21
Operating Sequence
21
Heating Mode
21
Thaw Cycle Start up / Shutdown
22
Blocked Vent / Condensate Disposal Shut down
23
Cooling Mode - Single Stage Operation
23
De-Humidification Control
23
Fan Mode
23
Component Functions
23
Equipment Maintenance
24
Heat Exchanger & Burner Maintenance
24
Cleaning of Burners
25
Replacement Parts
25
Troubleshooting
25
Cooling Mode
25
Heating Mode
25
Figures & Tables
26
Table 7. Center of Gravity & Shipping Weights
27
Airflow Information
28
Table 10. Blower Performance - 2 & 2.5 Ton
29
Table 11. Blower Performance - 3 Ton
30
Table 12. Blower Performance - 3.5 Ton
31
Table 13. Blower Performance - 4 & 5 Ton
32
Gas Information
33
Figure 9. Gas Valve Label
34
Electrical Data
35
Electrical Diagrams
36
Wiring Diagrams
37
Figure 14. Three Phase, 3-5 Ton, 208/230V
38
Figure 15. Three Phase, 3-5 Ton, 460V
39
Charging Charts
40
Figure 18. Charging Chart for 3 Ton Units
41
Figure 20. Charging Chart for 4 Ton Units
42
Appendix A - Heat Exchanger Condensate Drain & Vent Kit (Horizontal Mount Applications)
43
About the Kit
43
Vent Pipe & Drain Hose Assembly
43
Vertical Drain Pit Method
43
Preparing the Pit
44
Percolation Test (Optional)
44
Vertical Drain Pipe Installation
44
Horizontal Drain Trench Method
44
Preparing the Trench
45
Horizontal Drain Pipe Installation
45
Completing the Vent Installation
45
Appendix B - Heat Exchanger Condensate Drain & Vent Kit (Roof Curb Mount Applications)
47
About the Kit
47
Before Setting Unit on the Curb
47
Setting the Unit
48
Completing the Heat Exchanger Condensate Drain Installation
48
Completing the Vent Pipe Installation and Assembly
48
Installation / Performance Check List
52
Advertisement
Nordyne R8HE Series Installation Instructions Manual (40 pages)
GROUND MOUNT - SINGLE PACKAGE GAS HEATING / ELECTRIC COOLING
Brand:
Nordyne
| Category:
Fan
| Size: 5.2 MB
Table of Contents
Table of Contents
2
Important Safety Information
3
Requirements & Codes
4
General Information
5
Before You Install this Unit
5
Locating the Equipment
5
Heating Load
5
Combustion Air & Venting Requirements
6
Vent Termination
6
Circulating Air Supply
7
Air Ducts
7
Air Filter Requirements
7
Unconditioned Spaces
7
Acoustical Duct Work
7
Unit Installation
8
Packaging Removal
8
Rigging & Hoisting
8
Clearances to Combustible Materials
8
Ground Level
8
Condensate Drain (Air Conditioning)
8
Electrical Wiring
9
Pre-Electrical Checklist
9
Grounding
9
Line Voltage
9
Thermostat / Low Voltage Connections
10
2-Stage Heat / 1-Stage Cool Thermostat
10
Single Stage Heat / Single Stage Cool Thermostat
10
Checking Heat Anticipator Settings
10
Cooling Configurations
10
Heating Configurations
10
Blower Speed
10
Configuring the Fixed Speed Blower
11
Selecting Cooling Airflow
11
Selecting Heating Airflow
11
Dehumidification Options
11
Optional Furnace Control Board Connections
11
Electronic Air Cleaner
11
Humidifier
11
Gas Supply & Piping
12
Leak Check
12
High Altitude Conversion - Natural Gas
13
LP / Propane Gas Conversion
13
Start up & Adjustments
15
Pre-Start Check List
15
Start-Up Procedure
15
Air Circulation
15
Lighting the Appliance
15
Verifying System Heating
16
Verifying & Adjusting Temperature Rise
16
Gas Supply Pressure Verification & Adjustment
16
Verifying the Firing Rate of the Appliance
16
Measuring the Manifold Pressure
17
Adjusting the Manifold Pressure
17
Removing the Manometer/Pressure Gauge
17
Verifying Over-Temperature Limit Control Operation
17
Verifying Burner Operation
18
Verifying System Cooling
18
Operating Sequence
19
Heating Mode
19
Thaw Cycle Start up / Shutdown
20
Blocked Vent / Condensate Disposal Shut down
20
Cooling Mode - Single Stage Operation
20
De-Humidification Control
20
Fan Mode
20
Component Functions
20
Equipment Maintenance
21
Heat Exchanger & Burner Maintenance
21
Cleaning of Burners
22
Troubleshooting
22
Cooling Mode
22
Heating Mode
22
Figures & Tables
23
Airflow Information
24
Gas Information
29
Electrical Data & Diagrams
31
Cooling Configuration
31
Charging Charts
33
Appendix - Heat Exchanger Condensate Drain & Vent System
36
Vent Pipe & Drain Hose Assembly
36
Vertical Drain Pit Method
36
Preparing the Pit
37
Percolation Test (Optional)
37
Vertical Drain Pipe Installation
37
Horizontal Drain Trench Method
37
Preparing the Trench
38
Horizontal Drain Pipe Installation
38
Completing the Vent Installation
38
Replacement Parts
38
Installation / Performance Check List
40
Advertisement
Related Products
Nordyne R-410A
Nordyne R4GD Series
Nordyne R6GD-X36
Nordyne R4GD 024K045
Nordyne R4GD 024K072
Nordyne R4GD 030K072
Nordyne R4GD 042K072
Nordyne R4GD 060K096
Nordyne R4GD 060K120
Nordyne R8HE-A
Nordyne Categories
Furnace
Air Conditioner
Heat Pump
Air Handlers
Gas Heater
More Nordyne Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL