APPENDIX - HEAT EXCHANGER CONDENSATE DRAIN & VENT SYSTEM
WARNING:
ELECTRICAL SHOCK, FIRE OR
EXPLOSION HAZARD
Failure to follow safety warnings exactly could
result in serious injury or property damage.
Improper servicing could result in dangerous
operation, serious injury, death or property
damage.
• Before servicing,disconnect all electrical power
to the equipment.
• When servicing controls, label all wires prior
to disconnecting. Reconnect wires correctly.
• Verify proper operation after servicing.
This appendix section is a supplement for the Condensate
Drain and Vent Kit (P/N 922323) that is available for
purchase as an accessory item for R8HE series condensing
style package gas/electric units. These instructions may be
used to properly field install a heat exchanger condensate
disposal and venting system. Table 19 is a detailed listing
of the components that will be needed to properly connect
the heat exchanger condensate drain and vent system if
the kit is not being used.
ITEM #
1
2" PVC x 90 Degree Elbow & 1/4" Mesh Screen
2
2" PVC x 10" Pipe
3
2" PVC Tee
4
2" x 1/2" PVC Reducer Bushing
5
1/2" Barb x 1/2" NPTF
6
Spring Hose Clamp
7
1/2" ID x 36" Drain Hose
8
Horizontal Vent Support Bracket & U-Bolt
9
1/4-20 Nuts
Self Drilling Screws (Not shown)
Wire Tie (Not shown)
3 Ft. Flexible Insulation (Not Shown)
2" PVC pipe x Length. (Length is approximately 16" + Regional Frost Line Depth for
unit on standard 2' concrete pad). NOTE: For a trench style drain installation (page 3)
you will also need 4"x36" (min.) corrugated flexible pipe w/ drain holes, a 2"x4" PVC
reducer, 4" corrugated piping connection, 2"x90 degree PVC elbow, and 4" filtration
sleeve or permeable barrier material. (Not Shown)
40-80 Lb. Rock or chat, (Limestone rock or lime pellets if required by local code for
neutralizing the condensate when disposing into the ground). (Not Shown)
PVC Solvent Cleaner and Pipe Cement. (Not Shown)
36
FIELD SUPPLIED PARTS
DESCRIPTION
Table 19. Parts List
Vent Pipe & Drain Hose Assembly
1. Connect the horizontal 13.25" x 2" PVC pipe (supplied
with the unit) to the inducer motor rubber coupler
and secure using 3" hose clamp provided. NOTE: A
horizontal pipe length up to 18" is approved if pit location
circumstances require it to be further from the unit and
pad. A new support bracket or adaptor piece will have
to be field created to ensure the vent assembly does
not rotate.
2. Clean & glue the 2" x ½" reducer bushing into the Tee.
3. Install the ½" hose connector to the reducer bushing.
4. Place the 2" PVC Tee onto the end of the horizontal
pipe. DO NOT CEMENT THE TEE ON AT THIS TIME.
Drop a plumb line from the bottom of the ½" drain fitting
to the ground to locate the starting point of the pit or
trench.

Vertical Drain Pit Method

IMPORTANT NOTE: The flue condensate of this unit
is slightly acidic and some local codes may require
a neutralizing treatment when disposing directly into
the ground. Check state or local code requirements
for application of this equipment and if necessary
substitute limestone rock, chat, or lime pellets to
the pit to neutralize the condensate instead of using
basic rock or chat.
QTY
1
1
1
1
1
1
1
1
4
2
1
1
1
9
2
8
3
4
6
5
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ppg3he series

Table of Contents