a. Single-Phase (1ø) Wiring Connections/Hookup
The electrical input connections on ALL single-phase (1ø)
gas dryers are made into the rear service box located at the
upper left area of the dryer.
Single-Phase Electrical Lead Connections
White or Red
Black
Green
+
+
+
Neutral
Positive
Ground
or L2
FOR 110V APPLICATIONS
FOR 208-240V APPLICATIONS
A ground lug is provided in the rear electrical box to connect your service ground.
14
Maytag Co.
113307 - 7