4 ASSEMBLY
GUIDE
FOR
ZIP-FASTENER
INSULATION (FOR 750 AND 1000 LITRES)
Two people are enough to implement the assembly; three people are required for larger boilers; the
o
assembly must be implemented in areas with the temperature of at least 18
C.
If the insulation includes tank bottom insulation, the latter must be mounted first. Consequently, the
insulation is inserted around the boiler; pre-pressed insulation openings must be respected.
By slight pull in the direction of the arrows, pull both sides of the zip-fastener insulation so that (Figure 11)
the insulation does not slide and the insulation holes sit on the boiler inlets and outlets
It must be secured that before closing; both halves of the zip-fastener were not further 20 mm
(Figure 12). No foam shall get into the zip-fastener on closing.
After the insulation coat is properly mounted and the zip closure closed properly, insert the top lid made of
foam material and cover it with either a foil cover or a plastic lid. It is also possible to glue the outlet caps to
connection places (Figure 13). The insulation may only be stored in dry storage places.
We take no responsibility for damages caused by not respecting this guide.
Figure 11
Figure 12
Figure 13