CONTENT TECHNICAL SPECIFICATION OF PRODUCT ....................4 FUNCTION DESCRIPTION ........................4 PRODUCT DESCRIPTION ........................4 TECHNICAL PARAMETERS ........................5 1.3.1 TECHNICAL PARAMETERS OF HEATERS WITH ONE EXCHANGER ..........5 1.3.2 TECHNICAL PARAMETERS OF HEATERS WITH TWO EXCHANGERS ........... 6 1.3.3 PERFORMANCE DATA ........................
Page 3
READ CAREFULLY THE BELOW INSTRUCTIONS PRIOR TO THE INSTALLATION THE HEATER! Dear Customer, The Works Cooperative of Dražice – Machine Plant, Ltd., would like to thank you for your decision to use a product of our brand. With this guide, we will introduce you to the use, construction, maintenance and other information on electrical water heaters.
1 TECHNICAL SPECIFICATION OF PRODUCT 1.1 FUNCTION DESCRIPTION Indirect stationary heaters lines NTR and NTRR are used for water heating in conjunction with another source of heating water, most often a gas boiler. The NTRR types combine two sources of heating water (gas boiler + a solar system or a heat pump).
1.3 TECHNICAL PARAMETERS 1.3.1 TECHNICAL PARAMETERS OF HEATERS WITH ONE EXCHANGER OKC 300 OKC 400 OKC 500 OKC 750 OKC 1000 TYPE NTR/1MPa NTR/1MPa NTR/1MPa NTR/1MPa NTR/1MPa Tank capacity Diameter 1010 Weight Operating hot service water pressure Operating heating water pressure Max temperature of °C heating water...
1.3.2 TECHNICAL PARAMETERS OF HEATERS WITH TWO EXCHANGERS OKC 300 OKC 400 OKC 500 OKC 750 OKC 1000 TYPE NTRR/1MPa NTRR/1MPa NTRR/1MPa NTRR/1MPa NTRR/1MPa Tank capacity Diameter 1010 Weight Operating hot service water pressure Operating heating water pressure Max temperature of °C heating water Max temperature of...
Page 8
NL Power Factor Based on DIN, the expression of a normal flat is introduced for apartment houses in the FRG. Such a flat has four rooms; it is occupied by 3.5 people; it has a bathtub, a hand basin, and a sink. Flats of other sizes, number of occupants and different equipment are converted to normal flats using the relations given in the standard (NL).
2.2 CONNECTING A HEATER TO A HOT WATER DISTRIBUTION Scheme of heater´s water inputs and outputs OKC 300 NTR/1MPa, OKC 400 NTR/1MPa, OKC 300 NTRR/1MPa, OKC 400 NTRR/1MPa, OKC 500 NTR/1MPa OKC 500 NTRR/1MPa,...
2.3 PLUMBING FIXTURE Each hot service water pressure heater must have a membrane spring loaded with a safety valve. Nominal clearance of safety valves is defined by standard. The safety valve must be easily accessible, as close to the heater as possible. The inlet pipes must have at least the same clearance as the safety valve.
2.4 CONNECTING A HEATER TO A HEATING SYSTEM The heater is placed on the ground, next to the heating source, or in its vicinity. The heating circuit is connected to marked inputs and outputs of the heater exchanger; deaerating valve is mounted in the highest place.
An example of a group heater connection for steady hot service water consumption from all tanks using Tichelmann´s method C - Circulation 1 – Back-pressure valve 2 - Pump Figure 10 2.5 PUTTING THE HEATER INTO OPERATION Before opening the power supply, the tank must be filled with water. The process of first heating must be executed by licensed professional who has to check it.
Procedure: 1. Check both water and electric installation; for combined heaters, check the installation to a hot water heating system. Check proper placement of operating and safety thermostat sensors. The sensors must be inserted all the way in; first the operating and then the safety thermostat. 2.
2.7 INSPECTION, MAINTENANCE & CARE FOR THE APPLIANCE During the heating process the water that increases its volume during the heating must visibly drip off the safety valve outlet (in non-pressurised connection this water drips off the combination faucet valve). In full heating (about 74°C) the volumetric water gain is approx. 3.5 % of the tank capacity.
2.8 SPARE PARTS Magnesium anode Contact thermometer When ordering spare parts, give part name, type, and type number from the heater label. 3 IMPORTANT NOTICES 3.1 INSTALLATION REGULATIONS Without a confirmation of performed electrical installation issued by an authorised company, the warranty certificate shall be void. Check and exchange the Mg anode regularly.
Both the electric and water installation must follow and meet the requirements and regulations relevant in the country of use! 3.2 DISPOSAL OF PACKAGING MATERIAL AND FUNCTIONLESS PRODUCT A service fee for providing return and recovery of packaging material has been paid for the packaging in which the water heater was delivered.
4 ASSEMBLY GUIDE ZIP-FASTENER INSULATION (FOR 750 AND 1000 LITRES) Two people are enough to implement the assembly; three people are required for larger boilers; the assembly must be implemented in areas with the temperature of at least 18 If the insulation includes tank bottom insulation, the latter must be mounted first. Consequently, the insulation is inserted around the boiler;...
Need help?
Do you have a question about the OKC 300 NTR/1MPa and is the answer not in the manual?
Questions and answers