Daikin FCQ18PVJU Engineeiring Data page 37

Split system air conditioners skyair inverter
Hide thumbs Also See for FCQ18PVJU:
Table of Contents

Advertisement

Wiring diagrams
RZQ36MVJU / RZQ42MVJU
Notes:
1) All wiring, components, and materials procured on site must comply with all applicable
local and national codes.
2) Use copper conductors only.
3) See the Wiring Diagram for wiring details.
4) Install a circuit breaker for safety purposes.
5) All field wiring and components must be provided by a licensed electrician.
6) Unit must be grounded in compliance to applicable local & national codes.
7) Wiring shown is a general points-of-connection guide and is not intended to include
all details for a specific installation.
8) Be sure to connect the switch and fuse to the power line of the equipment.
9) Install a main switch capable of interrupting all power sources connected to the equipment.
34
EDSUSE28-956S
3D049204
RZQ-P, M series

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents