Site Preparation - Intel Express 100BASE-TX User Manual

Stackable hub
Hide thumbs Also See for Express 100BASE-TX:
Table of Contents

Advertisement

Site Preparation

Before you install the Express hub, prepare the installation site. Make
sure the operating environment meets the physical requirements of the
equipment.
Operating
Requirement
environment
Temperature
Ambient temperature between 5° C and 40° C
(41° F and 104° F)
No nearby heat sources such as direct sunlight,
warm air exhausts, or heaters
Humidity
Between 5% and 85% noncondensing
Ventilation
Minimum 2 in (5.08 cm) on all sides for cooling
Adequate airflow in room or wiring closet
Operating
At least 6 ft (1.83 m) to nearest source of
conditions
electromagnetic noise (such as photocopy
machine or arc welder)
Service access
Minimum 12 in (19.68 cm) front and rear for
service access and maintenance
Front and rear clearance for cables and wiring
hardware such as punchdown blocks
Power
Adequate power source within 6 ft (1.83 m)
Table and shelf
Approximately 13.25-in. (33.66 cm) by 19.25-in.
installation
(48.90 cm) area on a level tabletop or shelf
requirements
Support for at least 10 lbs (4.5 kg) per Express
hub with filler panels installed in expansion and
media adapter slots
Support for at least 12.3 lbs (5.6 kg) per Express
hub with an optional NMM installed the
expansion slot and an optional media adapter
module installed in the media adapter slot
Rack installation
Standard 19-in (48.26 cm) EIA equipment rack
requirements
1.5 EIA rack-mount spaces available for each
Express hub
Wiring hardware
Wiring hardware, such as punchdown blocks or
patch panels, in place before installing the hub

Advertisement

Table of Contents
loading

Table of Contents