Mitsubishi Electric PUHZ-W50VHA-BS Service Manual page 94

Air to water heat pump
Hide thumbs Also See for PUHZ-W50VHA-BS:
Table of Contents

Advertisement

OPERATING PROCEDURE
14. Removing the reactors (ACL1, ACL2, ACL3)
(PUHZ-HW112/140Y)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the 6 screws, that fix the front panel and remove
the front panel.
(4) Remove the 2 screws, screw
fix the separator, screw
9
from the bottom of the separator, and tilt the separator
to the side of the fan motor slightly. (See Photo 20)
(5) Disconnect the lead wires from the reactor and remove
the 4 screws, screw
reactor. (See Photo 21 and 22)
Note 1: The reactor is very heavy (4 kg)!
Be careful when handling it.
Note 2: The reactor box is also removable.
Photo 21
Propeller
Reactors
OCH439H
8
9
and
(both 4 × 10), that
8
from the valve bed and screw
0
, that fix the reactor to remove the
Reactor box
Photo 20
Reactor box
Photo 22
Reactor box
94
PHOTOS
Electrical parts box
Screw 9
Screw 8
0
Screw
Stay

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents