The Complete System CTC EcoAir 500M CTC EcoZenith i250 CTC EcoAir 500M is a modulating air source heat pump The CTC EcoZenith i250 is fully designed to work that takes heat from the outside air and supplies it to the with the CTC EcoAir 500M outdoor air heat pump.
Check and filling, heating system Information on fine adjustments Alarm information Functional test of safety valves fitted Information on procedures for fault registration ______________________________________ ______________________________________ Date / Customer Date / Installer CTC EcoAir 500M...
• Place the product on a solid foundation. • The CTC EcoAir 500M has a factory-fitted condensation water tray where the condensation water is conducted to a stone curb, surface water gully, down pipe or other drainage. You should therefore consider the position of the product.
• Never jeopardise safety by removing bolted covers, hoods or similar. • Never jeopardise safety by deactivating safety equipment. • Any work done on the product’s cooling system should be done by authorised personnel only. CTC EcoAir 500M...
General Information Operating range The control system for the CTC EcoAir 500M monitors and ensures that the product is working within its operating range. The picture shows the operating range at 50 rps. Primary flow Cº Outside temperature Cº CTC EcoAir 500M...
If there already is a Delivery includes ground fault breaker, the CTC EcoAir must • 1 x Heat pump CTC EcoAir 500M also be fitted with • 15 m cable LiYCY (TP) with connector for communication CTC EcoAir 162 101 74-2 2015-05-25 its own ground fault •...
General Information Placement of the heat pump • CTC EcoAir 500M is normally placed against an outside wall. >0.4 m • The CTC EcoAir 500M has a factory-fitted condensation water tray where the condensation water is conducted to a stone curb, surface >1 m...
• Place crushed stones around the blocks to achieve optimal drainage. 551 mm Moisture barrier, c/c dimension 1285 mm moisture barrier, up against the building Concrete blocks 1285 foundations. 1285 Coarse crushed stone about 70-100 cm deep. CTC EcoAir 500M...
• A heating cable (available as an accessory) should be placed in the pipe to prevent refreezing. The heating cable is connected to the electrical cabinet in the CTC EcoAir 500M. (Must be performed by an authorised electrician and according to applicable provisions.) •...
• The product can be bled via the bleed valve inside the condenser. NOTE! Only bleed this valve. Other valves are for the cooling system! If these are opened, refrigerant may leak out! CTC EcoAir 500M...
The heat pump’s lower connection must be connected to the charge pump so that water is pumped out to the heat pump. The heat pump’s upper connection is connected to the right diverting valve by the charge pump. CTC EcoAir 500M...
Before the front panel is opened or other live components are made accessible, the power supply to the heat pump absolutely must be disconnected. CTC EcoAir 500M can only be connected to the indoor unit CTC EcoZenith i250. Omnipolar safety switch...
Once the system has heated up, check that all connections are tight, the various systems have been bled, heat is coming out into the system and warm water is coming out at the tap locations. CTC EcoAir 500M...
Defrosting The CTC EcoAir 500M is fitted with hot gas defrosting. The heat pump checks constantly whether defrosting is needed and, if so, defrosting starts, the fan stops, the four-way valve changes direction and the hot gas goes to the evaporator instead.
Page 33
As an accessory you can buy a heating cable to connect to EcoAir. The cable is fitted in the drain from the condensation tray to the frost-free drain. Condensation tray and drain CTC EcoAir 500M...
7. Troubleshooting/appropriate measures The CTC EcoAir 500M is designed to provide reliable operation and high levels of comfort, and to have a long service life. Various tips are given below which may be helpful and guide you in the event of an operational malfunction.
Försäkran om överensstämmelse Déclaration de conformité Declaration of Conformity Declaration of conformity Konformitätserklärung Enertech AB Box 313 S-341 26 LJUNGBY försäkrar under eget ansvar att produkten, confi rme sous sa responsabilité exclusive que le produit, declare under our sole responsibility that the product, erklären in alleiniger Verantwortung, dass das Produkt, Modell EA510M+EZi250 Modell EA520M...
Page 40
Enertech AB. PO Box 309 SE-341 26 Ljungby Sweden. www.ctc.se, www.ctc-heating.com...