4 - Install drain trap using appropriate PVC fittings, glue
all joints. Glue the provided drain trap as shown in fig
ure 52. Route the condensate line to an open drain.
Condensate line must maintain a 1/4" downward slope
from the furnace to the drain.
CONDENSATE TRAP AND PLUG LOCATIONS
(Unit shown in upflow position)
Trap
(same on
right side)
1-1/2 in.
NOTE - In upflow applications where side return
air filter is installed on same side as the conden
sate trap, filter rack must be installed beyond
condensate trap or trap must be re-located to
avoid interference.
FIGURE 44
5 - Figures 48 and 49 show the furnace and evaporator
coil using a separate drain. If necessary the conden
sate line from the furnace and evaporator coil can
drain together. See figures 47, 50 and 51.
Upflow furnace (figure 50) - In upflow furnace applica
tions the field provided vent must be a minimum 1" to a
maximum 2" length above the condensate drain outlet
connection. Any length above 2" may result in a
flooded heat exchanger if the combined primary drain
line were to become restricted.
Horizontal furnace (figure 51) - In horizontal furnace
applications the field provided vent must be a mini
mum 4" to a maximum 5" length above the condensate
drain outlet connection. Any length above 5" may re
sult in a flooded heat exchanger if the combined pri
mary drain line were to become restricted.
NOTE - In horizontal applications it is recommended to
install a secondary drain pan underneath the unit and
trap assembly.
Plug
(same on left side)
Page 32
NOTE - Appropriately sized tubing and barbed fitting
may be used for condensate drain. Attach to the drain
on the trap using a hose clamp. See figure 45.
Field Provided Drain Components
Elbow
Tubing
FIGURE 45
CAUTION
Do not use copper tubing or existing copper conden
sate lines for drain line.
6 - If unit will be started immediately upon completion of
installation, prime trap per procedure outlined in Unit
Start-Up section.
CONDENSATE TRAP LOCATIONS
(Unit shown in upflow position with remote trap)
Field ProvidedVent
Min. 1" Above Condensate
Drain Connection
1" Min.
2" Max.
*5' max.
PV CPipeOnly
Trap can be installed a
maximum 5' from furnace
*Piping from furnace must slope down a minimum of
1/4" per ft. toward trap.
FIGURE 46
Barbed Fitting
Hose Clamp
T o Drai n