Aaeon FSB-868G User Manual page 33

Rev.b full-size cpu card
Table of Contents

Advertisement

F u l l - s i z e C P U c a r d
d. Close the upper plate (A), place the load lever back
Step 4: (Heatsink/ Fan Installation).
a. Place bottom bracket underneath the socket making
Chapter 3 CPU, Heatsink and Fan Installation
to the original position and tightly wedge the lever
into the fastening tab. (B)
sure that threaded socket is aligned with the holes in
the motherboard.
F S B - 8 6 8 G R e v . B
A
B
3-6

Advertisement

Table of Contents
loading

Table of Contents