Bryant 619E Installation, Start-Up And Service Instructions Manual page 28

High wall fan coil units
Table of Contents

Advertisement

HAS PIPING SYSTEM BEEN EVACUATED TO 1000 MICRONS?
HAS SYSTEM CHARGE BEEN WEIGHED IN (IF REQUIRED)?
HAVE SERVICE VALVES BEEN FULLY BACKSEATED?
CHECK VOLTAGE: IS VOLTAGE WITHIN RANGE SHOWN FOR UNIT (WITH UNIT OPERATING)?
OUTDOOR
IV. START-UP
IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS?
MEASURE AND RECORD THE:
AIR ENTERING OUTDOOR UNIT:
AIR ENTERING INDOOR UNIT:
DISCHARGE LINE TEMPERATURE:
VAPOR LINE TEMPERATURE:
MEASURE AND RECORD THE:
VAPOR LINE PRESSURE:
DISCHARGE PRESSURE:
Copyright 1999 Bryant Heating & Cooling Systems
START-UP CHECKLIST (cont)
INDOOR
F
F
F
F
PSIG
PSIG
CL-2
CATALOG NO. 5361-900

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents