Installation
Functional Test
Once the mounting, wiring, and other installation steps are completed, proceed to the FXR Series
Inverter/Charger Operator's Manual. The Operator's Manual has steps for system commissioning. These
include powering up and performing a functional test on the inverter system, as well as powering
down and adding new devices to an existing system.
Refer to the system display manual for programming instructions and menus.
Emissions
Compliance with the EMC directive for emissions is achieved with installation of EMC kit FXR-FILTER or
equivalent. Installation instructions for FXR-FILTER are available.
Symbols Used
WARNING: Hazard to Human Life
This type of notation indicates that the hazard could be harmful to human life.
CAUTION: Hazard to Equipment
This type of notation indicates that the hazard may cause damage to
the equipment.
IMPORTANT:
This type of notation indicates that the information provided is important to
the installation, operation and/or maintenance of the equipment. Failure to
follow the recommendations in such a notation could result in voiding the
equipment warranty.
MORE INFORMATION
When this symbol appears next to text, it means that more information is available in other
manuals relating to the subject. The most common reference is to the Operator's Manual for the
appropriate inverter model. Another common reference is the system display manual.
36
900-0168-01-00 Rev A