Installation
Functional Test
Once the mounting, wiring, and other installation steps are completed, proceed to the Radian Series
Inverter/Charger Operator's Manual. The Operator's Manual has steps for system commissioning. These
include powering up and performing a functional test on the inverter system, as well as powering
down and adding new devices to an existing system.
Refer to the MATE3 Owner's Manual for programming instructions and menus.
38
900-0021-01-00 Rev B