Preparation Before Installation; Selection Of The Location - York MCC-MCH 09 Installation Manual

Minisplit floor/ceiling
Table of Contents

Advertisement

PREPARATION BEFORE INSTALLATION

• Before doing any work, check the interior power supply cord and the main breaker capacity are sufficient and the
installation area is sufficient and complies with the requirements.
• Check that the power supply available agrees with nameplate voltage.
• Electrical work, wiring and cables must be performed in compliance with national and local wiring codes and
standard.
• Do not use the extension cables. In the case extended cables are needed, use the terminal block.

SELECTION OF THE LOCATION

Select a place which provides the space around the units as shown in the
diagram below.
Indoor Unit
Dimension
(cm)
09
12
A
50
50
B
80
80
C
5
5
D
20
20
MCC-MCH
18
25
35
45
55
50
50
50
50
50
80
80
80
80
80
5
5
5
5
5
20
20
20
20
20
Outdoor Unit
Dimension
(cm)
09
12
A
40
40
B
20
20
C
20
20
D
60
60
MOC-MOH
18
25
35
45
55
40
40
40
40
40
20
20
20
20
20
20
20
20
20
20
60
60
60
60
60
(continued)
7
FLOOR/CEILING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents