Milano Oven Kit Parts List - WILDWOOD OVENS &BBQ’S TOSCANO Installation Instructions Manual

Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS: Failure to follow instructions may result in significant oven
damage and may void your warranty.
Before you Begin
Please read this entire manual before installing the oven. Failure to follow instructions may result
in property damage, bodily injury, or even death. Be sure to place orders early for any items
that are necessary to complete your project. It is best to have everything you need prior to
beginning construction.
TOSCANO OVEN KIT PARTS LIST
A
2-Pre-cast hearth sections
B
4-Pre-cast dome sections
C
1-Steel oven door (available in stainless steel)
D
5-Tubes Fireplace Mortar
E
1-Fiber insulation blanket (12 ft roll, 24 in wide)
F
1-SAFETY INFORMATION PLAQUE
ADDITIONAL RECOMMENDED MATERIALS:
G
1-1" Thick Heat stopper board (48"x48")
H
1 Roll of Diamond Lath Mesh (8 ft roll, 27 in wide)
 Chimney System customized to fit the oven application (see pg 15 for contact information)
 1-Tube of high temperature sealant for anchor plate
 12-24 Alcohol Can Heat (used for buffet tray warmers) Available at Wildwood!
**Oven has to reach 350 degrees on first initial curing. Never cure an insulated oven.
*Fireplace Mortar provided by Wildwood is tested and approved to meet safety standards and therefore must be
the only sealant/adhesive used in oven assembly. Do not use an alternate sealant/adhesive
**
SAFETY INFORMATION PLAQUE must be adhered to the facade of the oven, at a location that is visible to the
user at all times. Do not remove this plaque. Please refer to Safety Plaque Location Diagram on page 4 for
recommended locations.
***
DIAMOND LATH MESH can be purchased from any local home improvement/hardware store.
©Wildwood Ovens and BBQs LLC 2009
*
**
WWW.WILDWOODOVENS.COM
***
1
323.255.6587
All specifications subject to change without notice
Toscano
Wood Fired Oven
Installation Instructions
Version 4.0

Advertisement

Table of Contents
loading

Table of Contents