Mounting The Hood Vsu - Valore SUMMIT VSU-E30CS Use, Care And Installation Manual

Table of Contents

Advertisement

CAUTION: At least two installers are
required due to the weight and size of the
hood.
1. Measure from range top to hood bottom and mark line A.
2. Plum and mark center line.
4. Mark mounting spread from C/L on line B. From center
fasten screws all the way. Note: wood blocking may
need to be added behind the drywall if no studs are
present. Wall anchors may also be used but check
local codes for compliance. Failure to use suitable
wall anchors and screws to hold the weight of the
hood could result in personal injury or damage to
cooking sureface or counter.
the last M4x1-1/4" screw to further secure the hood to
the wall from inside the hood.
7. Center and attach duct cover bracket to wall below
8. Install electrical.
9. *Install duct work and duct tape.
10. Power up hood and check for leaks around duct tape.
11. Place telescopic duct covers onto hood and extend
*if using hood in recirculating mode you must secure air
diverter plate onto wall before installing duct work and
duct covers. Turn to page 14 for more details.
Cable Lock
be required by local codes. Check with local
requirements and codes, purchase and install
appropriate connector if necessary.
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
B
A
Cable Lock
10
C/L
Duct Cover Bracket
3-1/2"
2"
12 1/4"
26" min
C/L
fig. A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Summit vsu-e36csPlateau vpl-e36asPlateau vpl-e30as

Table of Contents