Using Boiler Template - Vaillant aquaPlus Instructions For Installation And Servicing

Gas fired room sealed fan assisted combination boiler with intergrated 15 litre power store
Hide thumbs Also See for aquaPlus:
Table of Contents

Advertisement

5 Boiler Installation Sequence

5.2 Using boiler template

Fix the paper template to the wall ensuring that the
correct flue exit point has been identified, ensure that
the template is vertical.
The template shows
- The position of the fixing holes for the boiler
mounting bracket.
- The position of the connections.
- The position of the flue exit hole.
- Upper hole (2) indicates top outlet flue with flue
turret facing rearward.
• Mark the position of the hanging bracket fixing holes
(1).
• Drill 2 holes Ø10 mm for the hanging bracket.
Note: Use alternative fixing holes where necessary.
Top outlet rear exit
Mark the centre of the selected air/flue duct and its
circumference, e.g. by drilling through the template.
Other flue options
Flue instructions for other flue systems such as vertical
RSF flues, flues run to the side of the boiler and the use
of additional bends etc. are detailed in the flue
installation instructions provided with the boiler.
Remove the template from the wall and plug the drilled
holes using the wallplugs supplied.
14
Supplied by HeatingSpares247.com
2
5
Fig. 5.3: Using Boiler template
Instructions for installation and servicing aquaPLUS VUI 362-7
60/100
30,5
5
12,5
1
124175 GB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquaplus seriesAquaplus vui 362-7

Table of Contents