11.0 COMMISSIONING RECORD
Installation Date:
Model and Serial Number:
Installer (Plumbing):
Contact Details:
Competency Scheme & ID Number:
Installer (Electrical):
Contact Details:
Competency Scheme & ID Number:
Comments:
________________________________________________
________________________________________________
________________________________________________
Mains supply pressure and flow rate
Isolation valve fitted
Flow reducer fitted
Pipework checked for leaks
Pipework bonded
Electrical connections checked
Thermostat locked
Thermostat setting
Water Temperature
18
____________________________________________
__________________________________
________________________________________
____________________________________________
________________________________________
____________________________________________
_________________________
_________________________