Axis 291 1U Video Server Rack - Overview; Placement Requirements - Axis 291 1U Installation Manual

Video server rack
Hide thumbs Also See for 291 1U:
Table of Contents

Advertisement

Page 4

AXIS 291 1U Video Server Rack - Overview

Read the following information to familiarize yourself with the AXIS 291 1U Video Server Rack,
making note of where the connectors and indicators are located.
Power
I/O Terminal
Connector 3
Connector
Power Connector - Input power: 100-240V AC, 50-60 Hz, 1.9A
I/O Terminal Connector(s) - provides the physical interface to the functions supported by the Axis
blade video server. For more information see page 8.
Power & Network LEDs - The 10/100 LED flashes red for 10 Mbit, and flashes green for 100 Mbit.
The 1000 LED flashes green for 1 Gbit. The power LED shows steady green when the rack is
powered.
Network Connector - Axis blade video servers are designed for 10/100/1000 Mbps networks and
are connected via a standard RJ-45 connector.

Placement requirements

The location the AXIS 291 1U Video Server Rack is used in must meet the following requirements:
Ambient temperature: 0° to +45°C (32° to 113°F)
Relative humidity: 20-80%
Power source within 1.8 meters
Minimum 5cm free space on each side, to ensure adequate ventilation
No excessive dust
Placement on a shelf/table
1. Attach the 4 rubber feet to the underside of the
unit, as illustrated here.
2. Place on a flat surface. Note that the AXIS Video
Server Rack with cables weighs up to 6kg. Check
that the surface can support this weight.
I/O Terminal
I/O Terminal
Connector 2
Connector 1
AXIS Video Server Rack Installation Guide
Power & Network
LEDs
Network
Connector

Advertisement

Table of Contents
loading

Table of Contents