Calibrating The Sprayhead Flow Rate - Bunn ITCB-DV Technical Training Manual

Table of Contents

Advertisement

FUNNEL DETECT?
NO
DONE
YES
BREW ALERT?
NO
DONE
YES
ENTER SERVICE #
NO
YES
SERVICE TOOLS
NO
YES
FACTORY DEFAULTS
NO
YES

Calibrating the Sprayhead Flow Rate

Step 1: Place a measuring container with a minimum capacity of 60 ounces
beneath the funnel of the brewer. Water can also be dispensed into the server and
then into the measuring container.
Step 2: Press and hold the right hidden switch to enter level 2 programming.
Continue to press the right hidden switch until the display reads "Calibrate Flow?".
Step 3: Press YES to advance to the "Spray Head Cal?" function screen.
Step 4: Press YES. The display will read "Container Ready?" If the container is
under the funnel, press YES. The display will read "Calibrate Spray...Press Brew to
Start".
Step 5: Press and release the BREW switch. The display will read "Calibrate
Spray...60 Sec to Finish". The 60 second timer on the display will count down to
zero. When the counter reaches zero, the display will change to OZ, along with the
existing ounces per minute.
Step 6: Measure the amount of water in the container and using the (-) or (+),
adjust the amount on the display to match the amount in the container. Then press
DONE.
Step 7: The display should now read "New Spray Flow" along with the correct flow
rate of the sprayhead in ounces per minute. After 5 seconds, the display will return
to the "Calibrate Flow?" screen.
Sets the inability to initiate a brew cycle if the funnel is not properly inserted into the
funnel rails.
By selecting yes to this option, a message will display alerting the operator that the
machine is currently in a brew process. If enabled, the message will only display while
the machine is brewing.
This function allows the operator to enter in the telephone number to call if service is
needed. The service number will be displayed anytime there is a fault message dis-
played.
(For Authorized Service Personnel Only)
This function allows the testing of individual components and the ability to check switch-
es for proper function. This function also tests the funnel sensor coil's frequency (diag-
nostic tool for troubleshooting purposes only).
Refer to Service Manual for in depth procedures.
This function allows the operator to erase all of the previously entered recipes and ad
messages. Factory-set default values will replace All previous settings.
CALIBRATE FLOW?
NO
YES
SPRAYHEAD CAL
NO
YES
CONTAINER READY?
QUIT
YES
CALIBRATE SPRAY
QUIT
START
CALIBRATE SPRAY
60 SEC TO FINISH
SPRAYHD OZ XX.X
(-)
DONE
(+)
NEW SPRAY FLOW
XX.X OZM
5 sec
CALIBRATE FLOW?
NO
YES
Bunn-O-Matic Corporation
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Itcb twin hvItcb-dv hv

Table of Contents