Download Print this page

Braeburn 140202 Installer's Manual page 4

Premier 2-zone controller
Hide thumbs Also See for 140202:

Advertisement

3
Wiring the Panel
Always turn off power to the heating/air conditioning system prior to installing or
adjusting the Premier 2-Zone Controller. Wire the entire panel before applying
transformer power.
Use the following general wiring instructions for all systems. Specific wiring will vary depending on the
equipment and type of system (conventional or heat pump).
3.1
Damper Wiring
Install the system dampers using the instructions provided
by the manufacturer.
Connect the dampers to the zone panel as shown for
either a 2-wire or 3-wire damper.
The sum of all dampers powered by the zone panel
should not exceed 35 VA at 24 VAC. Use a slave relay if
additional damper power is required.
Max. damper VA per panel
35 VA @ 24 VAC
3
PO
COM
PC
Zone Panel
PO
COM
PC
Zone Panel
M
M
2-Wire Damper
PO
C
PC
3-Wire Damper

Advertisement

loading